TIMBER FRAMES
Timber framed buildings have become increasingly popular due to the well established benefits of on-site construction speed and price predictability.
The environmental credentials of using sustainable resources are also becoming more and more important to everyone involved with the procurement of construction projects.
The viability of timber frame for projects where there is insufficient volume, insufficient procurement time or difficult access is a problem that often results in the option of timber frame construction being rejected. It becomes too expensive or too difficult.
S Coveney Contracts LTD delivers a back-to-basics lesson in timber frame building and, in so doing, makes our product the right price, readily available and easier to procure.
We also have the facility to assist clients with SAP calculations and determine insulation design to meet modern U-Value targets. If the preference is for offsite manufacture of panels, we can also provide for this at our warehousing facility.
Stick building is simply the construction of a timber frame on site utilising loose timber. It is a flexible system that avoids the need to pre-fabricate panels in a factory and is therefore cheaper, easier and quicker to procure.
We can build anything that can be built in timber frame, including:
extensions;
bungalows;
houses; and
multi-storey buildings.
We have built frames up to 7 storeys.