Folkestone Central railway station

Station Approach, Folkestone CT19 ,United Kingdom
Folkestone Central railway station Folkestone Central railway station is one of the popular Railway Station located in Station Approach , listed under Local business in Folkestone , Public Places & Attractions in Folkestone , Train Station in Folkestone , Railroad in Folkestone ,

Contact Details & Working Hours

More about Folkestone Central railway station

Folkestone Central railway station is on the South Eastern Main Line in England, and is the main station serving the town of Folkestone, Kent. It is 69mi down-line from London Charing Cross and is situated between and. The station and all trains that call are operated by Southeastern.HistoryThe South Eastern Main Line reached Folkestone in 1843, with a station being opened at Folkestone Junction (Folkestone East) on 18 December 1843. Folkestone West was then opened in 1863, with a station named Cheriton Arch being provided between the two on 1 September 1884. The name Radnor Park was adopted in 1886, and for a few years with just two platform faces, the station was rebuilt in 1890 to add a bay. The station was renamed Folkestone Central in 1895.The station was rebuilt at the time of the route's electrification in 1961 with two island platforms, linked by a subway and with ramps leading up from the ticket office and concourse, which is itself above street level (an approach road and accompanying pedestrian ramp leads up from Cheriton Road). In 1999 one island platform was abandoned, along with the subway; the platform has not been demolished, although all buildings have been removed.Services to and from Dover Priory were suspended on 24 December 2015 due to major damage to the track and sea wall near Dover harbour caused by strong winds & tidal surges. A replacement bus service was operation between the two stations, along with a modified timetable whilst repair work was carried out. This was expected to continue throughout 2016, whilst a new £44.5 million viaduct was constructed to replace the old rail embankment & sea wall. The line reopened on 5 September 2016, as the work progressed faster than originally anticipated.

Map of Folkestone Central railway station